Enjoy a new log of this project! Been busy with those UTO stories and forgot to post this and one other too... Oops.
Anyways, Enjoy! Fav and watch for more of this stuff folks! Feedback is always welcome! Again enjoy!
-[PROJECT]
[06]-
{Classifed by Drictor R.} (Codename: EDEN)
Date of original trials: 2/13/49 Date of curent / last trials: 1/2/92
Member(s): [9 total]
Dr.Lukas(Head), Dr.Willows(Physcoligist/Behavior expert), Dr.Rosen(Genitice), Dr.Grimis(Animal caretaker), Dr.Dillens(Engineering expert), Dr.Everet(Geniticice), Dr.Smith(Historian/Recorder), Mr.Firmic(Supervisor), Gen. Harisen(Military aid)
Modern trials: 79'-92'
Log #006 - F - (1980)
The new archive system has been installed completely and is ready to use! So I'm excited to use it for later work. Those test results are taking a while now. But I do support Williows stand on getting accurete result the first time. Grimis and Dillens are starting to colaberate on some new level layouts for our project. Pretty crazy their giving us a whole floor soon. Everet is more of a lone wolf in his rescreach with Rosen currently as they doing well but are close to killing one another too. Our work is vital for this. Everyone's repuations hang on this project now, it's too late to go back anyhow. Firmic once again is trying to keep us working hard which isn't easy. Even Lukas is slacking in realeation againest Harisen now. But they can't fire knowable scientists like our team so fast. Now paycuts and budget reworks. The whole team is slowly hateing what this project does for the Military these days. Rumors are to start about plans... and not legal ones at that for purposes. Red tape has left be bond to say nothing more on such matter anyhow now or ever.
Both subjects (A01 & A02) have progress very fast in learning and development as of late. There have been issues and inccdents for these path months for sure, but they are becoming a noticable sign of understanding most deem disturbing. Inccident report 023-L and 083-F details some of those problems noted as serious to staff. A list of issues/problems has been made to record these. That list has been already nicknamed by General Harisen, the "Wrap Sheet" as some call it. With Vietnam over many programs here may be primatting sent to storage. The General has taken some liking over A01(Adam)'s own insticts for combat and a perfernce for stealth tatics. Willows is trying to work with both Adam and Eve curently doing his best. Then A01(Adam) has started to silently rebel againest most to all athorety figures except to the EDEN team or well trust guards. Everyone else He shall precide to stay distent to or avoid all together. A02(Eve) has come to easier terms filling her place within the program. Adam as shunned her away as a result of being complient. Eve has become more open with the EDEN team also interest in meeting other new staff or other subjects. Currently A01(Adam) will likely be a trainer for combat, A02(Eve) shall be best for training in intractions and intuctions. Farther studies are being done currently. We have a new batch being made nearly ready. The 'B' line may show even greater progress then A01 and A02. A few trails in shall prove our programs future.
-[PROJECT]
[06]-
Anyways, Enjoy! Fav and watch for more of this stuff folks! Feedback is always welcome! Again enjoy!
-[PROJECT]
[06]-
{Classifed by Drictor R.} (Codename: EDEN)
Date of original trials: 2/13/49 Date of curent / last trials: 1/2/92
Member(s): [9 total]
Dr.Lukas(Head), Dr.Willows(Physcoligist/Behavior expert), Dr.Rosen(Genitice), Dr.Grimis(Animal caretaker), Dr.Dillens(Engineering expert), Dr.Everet(Geniticice), Dr.Smith(Historian/Recorder), Mr.Firmic(Supervisor), Gen. Harisen(Military aid)
Modern trials: 79'-92'
Log #006 - F - (1980)
The new archive system has been installed completely and is ready to use! So I'm excited to use it for later work. Those test results are taking a while now. But I do support Williows stand on getting accurete result the first time. Grimis and Dillens are starting to colaberate on some new level layouts for our project. Pretty crazy their giving us a whole floor soon. Everet is more of a lone wolf in his rescreach with Rosen currently as they doing well but are close to killing one another too. Our work is vital for this. Everyone's repuations hang on this project now, it's too late to go back anyhow. Firmic once again is trying to keep us working hard which isn't easy. Even Lukas is slacking in realeation againest Harisen now. But they can't fire knowable scientists like our team so fast. Now paycuts and budget reworks. The whole team is slowly hateing what this project does for the Military these days. Rumors are to start about plans... and not legal ones at that for purposes. Red tape has left be bond to say nothing more on such matter anyhow now or ever.
Both subjects (A01 & A02) have progress very fast in learning and development as of late. There have been issues and inccdents for these path months for sure, but they are becoming a noticable sign of understanding most deem disturbing. Inccident report 023-L and 083-F details some of those problems noted as serious to staff. A list of issues/problems has been made to record these. That list has been already nicknamed by General Harisen, the "Wrap Sheet" as some call it. With Vietnam over many programs here may be primatting sent to storage. The General has taken some liking over A01(Adam)'s own insticts for combat and a perfernce for stealth tatics. Willows is trying to work with both Adam and Eve curently doing his best. Then A01(Adam) has started to silently rebel againest most to all athorety figures except to the EDEN team or well trust guards. Everyone else He shall precide to stay distent to or avoid all together. A02(Eve) has come to easier terms filling her place within the program. Adam as shunned her away as a result of being complient. Eve has become more open with the EDEN team also interest in meeting other new staff or other subjects. Currently A01(Adam) will likely be a trainer for combat, A02(Eve) shall be best for training in intractions and intuctions. Farther studies are being done currently. We have a new batch being made nearly ready. The 'B' line may show even greater progress then A01 and A02. A few trails in shall prove our programs future.
-[PROJECT]
[06]-
Category Story / All
Species Unspecified / Any
Size 120 x 104px
File Size 3.7 kB
FA+

Comments