Besides redoing the grip tape. The board is complete. Had to fix some areas up recently.
In the future...;w; will probably consider spray painting the bottom...but for a first time prop building...it was worth figuring out what to do next time!
Took about...2-3 weeks of construction including adding the details.
The cover is a see through vinyl fabric to help with moisture :3.
Now to wait on the replacement order of the grip tape before storing in the closet until the rest of the prop bits are complete.
Skateboard was made using a ready made kit, poster board, silver paint, printed stickers, lots of glue, wheels and bearings, grip tape, glue gone, and lots of patience -because damn...this got on my nerves some days! XD-
the prop started production in March.
In the future...;w; will probably consider spray painting the bottom...but for a first time prop building...it was worth figuring out what to do next time!
Took about...2-3 weeks of construction including adding the details.
The cover is a see through vinyl fabric to help with moisture :3.
Now to wait on the replacement order of the grip tape before storing in the closet until the rest of the prop bits are complete.
Skateboard was made using a ready made kit, poster board, silver paint, printed stickers, lots of glue, wheels and bearings, grip tape, glue gone, and lots of patience -because damn...this got on my nerves some days! XD-
the prop started production in March.
Category Crafting / All
Species Unspecified / Any
Size 1280 x 1280px
File Size 268.5 kB
FA+

Comments