Here we are with the nose reinstalled. (you can hardly see the camera.
Tomorrow sees installation of the power control center and final testing.
Then the lover jaw goes on and the buck teeth. The back of the head
gets furred and the bandanna put on. Then fine tune the head for
comfort, make the tail and hot-glue it to the pants then "The Dread
Pirate Tabor" is finished and on to a photo shoot. Pretty much in the
home stretch. Should take a week or less.
Tomorrow sees installation of the power control center and final testing.
Then the lover jaw goes on and the buck teeth. The back of the head
gets furred and the bandanna put on. Then fine tune the head for
comfort, make the tail and hot-glue it to the pants then "The Dread
Pirate Tabor" is finished and on to a photo shoot. Pretty much in the
home stretch. Should take a week or less.
Category All / All
Species Unspecified / Any
Size 800 x 600px
File Size 421.3 kB
FA+

Comments